2019 Finish – A – Long

 

The 2019 Finish-A-Long Hosts:

Sandra of Sew of Course - Ireland
Marci of Marci Girl Designs - USA Louisiana
Leanne of She Can Quilt - Canada
Ella of Throw a Wench in the Works - USA Georgia
Karen of Capitola Quilter - USA California
Lynne of Tinking Along - USA Maryland
Izzy of Dizzy Quilts - Canada
Sarah of Sarah Goer Quilts - USA California
Julie of That's Sew Julie - USA Iowa
Sarah of Cedar Fork Stitches - USA Montana
Sharla of Thistle Thicket Studio - USA Kansas
Nicole of Handwrought Quilts - Canada

 

What is the Finish-A-Long?

The Finish - A - Long is the brainchild of Rhonda (All Things Stitchy, formerly Rhonda's Ramblings) and was started back in 2012 as a no pressure linky event that allows you to make a quarterly list of the works in progress (WIPS) that you are hoping to finish during that quarter of the year.  You create a list (big or small, short or long) at the beginning of the quarter and link up via one of the Finish - A - Long hosts blog linky post.  You then use that quarter to finish your projects, and at the end of the quarter you link up any of these finished projects and become eligible for prizes (randomly drawn.)  There is no penalty for not finishing these projects and they can be carried over to the next quarter.  Win, win!  One of the best aspects of the Finish - A - Long is the community involvement via the host blogs linky, Flickr, Instagram, and Facebook.  Once you have linked up, take some time to visit other links, leave comments, and participate!  You can encourage others and meet and make new friends!  Ready to participate?  The rules and schedule are below.

 

The Rules:

  • At the start of each quarter there will be a linky party for you to link up your proposed list of finishes. You must link up in order to be able to be eligible for those prizes at the end. Please only enter ONE blog post, Flickr photo, or Instagram photo at this starting link-up. If you use Flickr or Instagram please use a mosaic and describe your plans in the description.
  • In order for your projects to be eligible, they must be a tangible project at the start of the quarter.  That means, at the very least, a fabric pull matched to a pattern, a quilt top needs to be quilted, or a half knit jumper, etc. We love seeing your bee blocks, but they won't count unless you happen to be turning them all into a fully completed quilt THIS quarter.  We are looking for a proper UFO - UnFinished Object - which means it has to have been started.
  • As you complete each of your projects on your list, write a post about it on your blog, or a description with a Flickr or Instagram pic.
  • At the end of the quarter, link up each individual post/Flickr pic (please link back to your original list from the start of the same quarter in some way). For each finish/link you complete, you get an entry into the prize draw, and therefore it's in your best interest to write up a separate post for each!
  • A finish is defined as a completely finished project, eg. a quilt, quilted and bound, a bag that's fully lined and functional, or a jumper that one could wear out in public. We’re happy for you if you get a quilt top completed in one quarter, but hold onto it for the next quarter and see if you can get it quilted and bound before entering as a finish please.
  • You won't be punished if you don't finish your entire list, so feel free to make a big list and roll projects over from one quarter to the next if you need to.
  • All qualifying finishes will be put into a prize draw, and the names/numbers will be drawn at random for each of the prizes donated by our sponsors for that quarter. We will contact you by email (the one you enter when linking up) if you win a prize.
  • The finish linky party will be open for approximately a week, and then the linky party for the proposed finishes list for next quarter will open on the following day.
  • The FAL is open to anyone, anywhere in the world.

 

The 2019 Finish-A-Long Schedule:

Q1

  • 10 January (Thu) Proposed Finishes List - Linkup opens
  • 18 January (Fri) Proposed Finishes List - Linkup closes
  • 1 April (Mon) Finishes - Linkup opens
  • 2-6 April - Tutorial Week
  • 9 April (Tue) Finishes - Linkup closes

Q2

  • 10 Apr 2019 (Wed) Proposed Finishes List - Linkup opens
  • 18 Apr 2019 (Thu) Proposed Finishes List - Linkup closes
  • 1 July (Mon) Finishes - Linkup opens
  • 2-6 July - Tutorial Week
  • 9 July (Tue) Finishes - Linkup closes

Q3

  • 10 July (Wed) Proposed Finishes List - Linkup opens
  • 18 July (Thu) Proposed Finishes List - Linkup closes
  • 1 October (Tue) Finishes - Linkup opens
  • 2-6 October - Tutorial Week
  • 9 October (Wed) Finishes - Linkup closes

Q4

  • 10 October (Thu) Proposed Finishes List - Linkup opens
  • 18 October (Fri) Proposed Finishes List - Linkup closes
  • 1 January 2020 (Wed) Finishes - Linkup opens
  • 9 January 2020 (Thu) Finishes - Linkup closes

 

Our Fantastic Sponsors: